Concrete & footings2026 numbers · Updated November 29, 2026

2026 Concrete Slab, Footing & Bag Count Calculator

Turn a slab, footing or Sonotube into cubic yards and bags: 80, 60 and 40 lb counts, waste, the ready-mix order and short-load fee, the volume where a truck beats bags, and the wire mesh, rebar and control joints the pour needs.

1. What you are pouring

A residential slab on grade is usually 4 inches; a driveway 5 to 6 inches over a compacted base. A deck footing is commonly 12 inches across and below the frost line.

How much concrete this takes

Concrete volume with waste
—
—
Bags to buy
—
Cheaper way to buy it
—
Net volume
—
Slab or footprint area
—
Weight of the pour
—
Weight of the bags
—
Wire mesh
—
Control joints
—
Bags—
Ready-mix—
—
—

2. Waste, bags and the truck

Prices differ by region and by plant: an 80 lb bag of high-strength mix is commonly $6–$8, a yard of 3,500 psi ready-mix $150–$210, and a short-load fee $75–$250 depending on how far under the minimum the order lands.

3. What it costs

Cheapest way to get this concrete
—
—
Bags
—
Ready-mix
—
Bag price per cubic yard
—
Break-even volume
—
Truck order
—
Short-load fee
—
—

4. The comparison

Every row recomputes as you change the inputs above.

80, 60 and 40 pound bags for this pour

Bagcu ft per bagBags per cu ydBagsCostTons

Where a truck overtakes the bags

Volume (cu yd)BagsBag costTruck orderReady-mix costCheaper

Twenty bags or a truck? The pour decides

Every concrete project begins with the same estimate: the volume of the form in cubic feet, converted to cubic yards, with a little added for the fact that a form is never perfectly square. This calculator's defaults — a 10 by 10 foot slab at 4 inches — come to 33.3 cubic feet of concrete, which is 1.23 cubic yards, and 1.36 cubic yards once a 10% allowance is added. That volume is small enough to mix in a wheelbarrow and large enough that the arithmetic at the store matters: it is 62 bags of 80 pound mix, 2.48 tons of material to load, haul and mix, or a 1.5 cubic yard truck order with a $150 short-load fee on top.

That comparison — $419 in bags against $413 from a truck — is the question this page answers, and it is not a fixed answer. It depends on the volume, the price of a bag, the price of a yard and the plant's minimum, which is why all four are inputs. What follows is how each is built, and where the model stops.

Volume, shape by shape

A slab is length times width times thickness, with the thickness converted from inches to feet by dividing by twelve. A 4 inch slab over 100 square feet is 33.3 cubic feet; a 6 inch slab over the same area is 50. A strip footing is the same calculation with a narrow width: 60 feet of 16 inch by 12 inch footing is 80 cubic feet, or 3.26 cubic yards with waste. A round pier is pi times radius squared times depth, multiplied by the number of tubes: ten 12 inch tubes 4 feet deep is 31.4 cubic feet and 1.28 yards, which is the kind of job where a single tube — 3.14 cubic feet — is 6 bags of 80 pound mix and the arithmetic hardly matters.

ProjectNet cu ftcu yd with waste80 lb bagsBag costTruck orderReady-mix costCheaper
Slab 10′ × 10′ × 4″33.31.35862$4191.5$413Ready-mix
Slab 12′ × 12′ × 4″481.95688$5942$500Ready-mix
Slab 20′ × 24′ × 4″ (2-car pad)1606.519294$1,9856.75$1,181Ready-mix
Footing 40′ × 12″ × 12″401.6374$5001.75$456Ready-mix
6 × 10″ Sonotube, 4′ deep13.10.53324$1621$325Bags

The pattern in that table is the whole economics of concrete in one view. Small pours are bag territory because the truck's fixed costs dominate: a single footing or a set of deck piers costs more to deliver than to mix. Large pours invert it, because the bag price per yard does not fall with volume while the truck's fixed fee spreads across more yards. The 10 by 10 and the 12 by 12 slab sit near the crossover, which is exactly where the short-load fee decides the answer.

Bag yield, and why 45 bags is the number to remember

A bag is sold by weight and used by volume, and the conversion is the manufacturer's published fill data: an 80 pound bag of concrete mix yields about 0.60 cubic feet, a 60 pound bag 0.45 and a 40 pound bag 0.30. Since a cubic yard is 27 cubic feet, one yard takes 45 bags at 80 pounds, 60 bags at 60 pounds and 90 bags at 40 pounds. That single ratio is enough to price any pour in bags: multiply the yards by 45 and the bags by the bag price, or simply compare the bag price per yard with the truck price per yard.

Bagcu ft per bagBags per cu ydBags for this pourCostTons
80 lb bag — 0.60 cu ft0.604562$4192.48
60 lb bag — 0.45 cu ft0.456082$5542.46
40 lb bag — 0.30 cu ft0.3090123$8302.46

The smaller bags are not cheaper per yard; they exist because they are liftable. On this same pour, 40 pound bags cost $830 against $419 for 80 pound bags at the same price per bag, for the identical volume of concrete — the extra money buys nothing but a lighter bag. If the pour is small and the site is a back yard, that can be a fair trade. If the pour is 30 yards, it is not a trade at all.

Two practical notes on bags. Mixing 45 bags by hand is a long day even with a helper and a rented mixer, and the water ratio is the part that decides the strength: more water makes the mix easier to place and weaker in place, so measure water rather than judging it by eye. And a bag that has taken on moisture is a bag that has already begun to hydrate; lumpy mix should go back, not into the form.

The truck, the minimum and the short-load fee

Ready-mix is priced by the cubic yard and delivered by a truck that holds a load in a rotating drum. The plant sells in quarter-yard increments because the batch is measured that way, imposes a minimum order — commonly one yard, sometimes more — and charges a short-load fee when the order falls below a full-load minimum, typically somewhere around five yards, because a truck that delivers three yards has spent a delivery slot for three yards of revenue.

Volume (cu yd)BagsBag costTruck orderReady-mix costCheaper
0.2512$811$325Bags
0.523$1551$325Bags
145$3041$325Bags
1.568$4591.5$413Ready-mix
290$6082$500Ready-mix
3135$9113$675Ready-mix
5225$1,5195$875Ready-mix
10450$3,03810$1,750Ready-mix

This table is the same comparison at eight different sizes, holding the prices fixed. The crossover sits at 1.17 cu yd on the default prices: below it the bags are cheaper, above it the truck is. Note what the fee does to the shape of the curve: at half a yard the truck's $150 fee makes it nearly twice the price of the bags, while at ten yards the fee is a rounding error and the truck's lower price per yard carries the day.

That is why the default 10 by 10 slab comes out cheaper as a ready-mix order: 1.36 yards is just past the crossover, and the truck is $6 cheaper — but only if a truck can reach the pour. Access is the constraint the arithmetic cannot see. A truck needs a driveway the driver will enter, a clear path to within a chute's reach (about 16 feet, plus extensions), and a place to wash out. A back-yard patio behind a gate is a bag pour or a pump pour, and a pump has its own minimum and its own fee.

Change the two prices and the crossover moves with them. At a $160 yard and a $100 short load, the break-even on this same pour falls to 0.7 yards and the truck wins by a wider margin; at a $220 yard, the bags hold on longer. There is no universal answer, which is why the calculator asks rather than assumes.

Waste: why the form is never the volume

The calculated volume is the volume of a perfect prism. A real form is out of square by a fraction, the subgrade is not perfectly level, the concrete settles and compacts, and some of it leaves the chute onto the ground or into the wheelbarrow and never comes back. A 5% allowance covers a tight, well-built form on a flat base; 10% is the working default for a slab on grade; 15% is for a rough excavation, a footing trench with a sloped bottom, or a pour you cannot afford to run short on.

On the default slab the difference is visible but not dramatic: 56 bags with no allowance, 59 at 5% and 62 at 10%. On a larger pour the absolute numbers grow quickly — the 20 by 24 foot driveway at 5 inches is 8.15 yards and 367 bags at 10%. Running short mid-pour is the one error that cannot be fixed later: a cold joint where the first delivery met the second is a plane of weakness in the slab forever. When in doubt, round the volume up to the next quarter yard and let the plant take back what the form does not use.

Thickness, reinforcement and the joints

Thickness is a design decision rather than an arithmetic one, but the arithmetic shows what each half inch costs. On the 10 by 10 slab, 4 inches is 1.36 yards and 62 bags; 6 inches is 2.04 yards and 92 bags — half again the concrete for the same footprint. A residential patio or shed floor is usually 4 inches over a compacted base; a driveway carrying a vehicle is usually 5 to 6 inches, with a thicker edge; a footing is sized by the load and the soil, which is a question for the building department or an engineer rather than a calculator.

Slab thicknesscu yd with waste80 lb bagsBag costTruck orderReady-mix cost
4″1.3662$4191.5$413
5″1.777$5201.75$456
6″2.0492$6212.25$544

Reinforcement is not optional on a slab on grade in most of the country, and this page counts it as a reference rather than a design. Welded wire mesh — 6×6 W1.4/W1.4 is the common residential specification — comes in 5 by 150 foot rolls covering 750 square feet, and a slab needs about 10% more than its area for the overlaps: this pour takes 110 square feet, or 1 roll. A #4 rebar grid at 12 to 18 inches on centre is the alternative, and its quantity is the slab's area times the number of bars per foot in each direction, plus 10% for laps: at 18 inches on centre this slab needs about 147 linear feet, or 8 twenty-foot sticks weighing 98 pounds.

Control joints are the other half of crack control. Concrete shrinks as it cures, and a joint gives that shrinkage a place to open instead of letting a random crack find its own line. The usual rule is a joint every 2.5 times the slab thickness in feet — 10 feet for a 4 inch slab — laid out in a grid, with the joint depth about a quarter of the slab thickness. A 10 by 10 foot slab is already a single panel under that rule, so it needs no interior joint — the edges are its joints, plus a tooled line wherever it meets a step or a column base. A 16 by 24 foot slab at the same thickness needs 3 interior joints, because it is 2.4 panels long. Tool the joints while the concrete is still plastic or saw them within about 12 hours; a joint cut after the slab has already cracked does nothing for the crack.

Pour day: what the arithmetic does not cover

Three facts from the table above are worth carrying to the site. First, weight: 1.36 yards of concrete weighs about 2.66 tons, and a wheelbarrow holds about 6 cubic feet, which is six trips per yard. Second, time: a slab has to be placed, screeded, floated and finished before it sets, and a mix that sits in a wheelbarrow while you work is a mix that is already curing — pour in sections or get help. Third, weather: concrete placed in heat above about 90°F sets faster and needs to be kept wet; concrete placed near freezing needs to be protected, and a slab that freezes in its first day loses strength permanently.

Curing is the part that is easiest to skip and most expensive to skip. Concrete reaches most of its design strength in 28 days, but it needs moisture to do it: keeping the surface damp for seven days — a sprinkler, a curing compound, or plastic sheeting — is the difference between the strength the mix was designed for and the strength the slab actually has. Nothing in the bag count changes that.

This page is an estimating aid, not a structural design. Slab thickness, footing size, reinforcement and the need for a permit are set by the load, the soil and the local code, and are the work of an engineer or the building department. Bag yields and coverage vary with how the mix is placed; confirm the order against the product and the plant before you pour.

Frequently asked questions

How many 80 lb bags of concrete do I need for a 10 by 10 slab?

A 10 by 10 foot slab at 4 inches is 33.3 cubic feet, or 1.23 cubic yards; with a 10% allowance it is 1.36 yards and 62 bags of 80 pound mix. That is 2.48 tons, or a 1.5 yard truck order at $413.

How many bags of concrete are in a cubic yard?

Forty-five 80 pound bags, sixty bags of 60 pounds and ninety bags of 40 pounds, because a yard is 27 cubic feet and those bags yield 0.60, 0.45 and 0.30 cubic feet. One yard weighs about 4,050 pounds.

Is it cheaper to mix concrete or order ready-mix?

Below about 1.17 cu yd on these prices, bags are cheaper; above it, the truck wins because its short-load fee spreads over more yards. This pour is 1.36 yards and comes out cheaper as a ready-mix order. The crossover moves with your local bag price, yard price and minimum order, so enter them and read the answer.

How much does a yard of concrete cost in 2026?

A yard of 3,500 psi ready-mix commonly prices at $150 to $210 plus a short-load fee of $75 to $250 under the plant's minimum, and an 80 pound bag of high-strength mix at $6 to $8, which is $270 to $360 a yard in bags. This calculator uses $175 a yard, $6.75 a bag and a $150 short load as defaults to change.

Every figure on this page is an estimating aid for a building-material purchase, not a structural design, a contractor's bid, or a permit drawing. Coverage rates, bag yields, prices, and local code requirements vary; confirm the quantity against the product label and the job with a licensed contractor or your local building department before you buy.