The three calculators
Every one runs locally. Nothing you type is sent anywhere, stored, or sold.
Paint Coverage
Work out how many gallons a room actually needs: wall and ceiling area, door and window deductions, one to three coats, textured or smooth coverage, a dark-to-light colour change, primer, and the cheapest mix of 1-gallon cans and 5-gallon pails.
Tile & Flooring
Size a tile order from the actual room: multiple areas, tile size, grout joint, pattern waste, boxes and loose tiles, thinset by trowel notch, grout by joint geometry, and the full material cost with the surplus you will be left holding.
Concrete Slab
Turn a slab, footing or Sonotube into cubic yards and bags: 80, 60 and 40 lb counts, waste, the ready-mix order and short-load fee, the volume where a truck beats bags, and the wire mesh, rebar and control joints the pour needs.
The 2026 numbers behind the results
Published figures with the source named, so you can check any of them.
| Item | 2026 figure | Where it comes from |
|---|---|---|
| Interior paint coverage, smooth primed drywall | 350–400 sq ft/gal | Manufacturer label range; 375 used as the default |
| Interior paint coverage, textured or porous | 250–300 sq ft/gal | Manufacturer label range; 275 used |
| Bare, unprimed drywall, first coat | 300 sq ft/gal | Label figure for a sealing first coat |
| Primer coverage | 300 sq ft/gal | Label figure for a drywall or stain-blocking primer |
| Standard opening deductions | Door 21 sq ft · Window 15 sq ft | Trade estimating convention (3'0" x 7'0" door, 3'0" x 5'0" window) |
| Finish coats for a colour change | 2 | Industry practice; one coat only on an identical colour |
| Dark-to-light colour change | +1 coat and a stain-blocking primer | Paint-desk practice for hiding a strong or dark colour |
| Tile waste, straight lay / brick / diagonal / herringbone | 10% / 12% / 15% / 20% | Contractor cutting allowance by lay pattern |
| Tiles per square foot | 144 ÷ (tile width x tile height) | Tile area arithmetic in inches |
| Thinset coverage, 50 lb bag | 95 / 65 / 42 / 22 sq ft | 1/4x1/4, 1/4x3/8, 1/2x1/2 and 3/4x3/4 in square-notch trowels |
| Grout joint depth used | Tile thickness + 1/4 in | Joint filled over the mortar bed and the tile edge |
| Grout density used | 100 lb per cu ft | Cementitious grout, 0.0579 lb per cubic inch |
| Concrete bag yield | 80 lb 0.60 · 60 lb 0.45 · 40 lb 0.30 cu ft | Manufacturer fill data; 45, 60 and 90 bags per cubic yard |
| Concrete weight | 145 lb per cu ft | Normal-weight ready-mix, about 4,050 lb per yard |
| Ready-mix order increment | 1/4 cu yd, 1 yd minimum | Standard batch-plant practice |
| Wire mesh roll | 5' x 150' = 750 sq ft | 6x6 W1.4/W1.4 welded wire, 10% overlap added |
| #4 rebar | 0.668 lb/ft, 20 ft sticks | ASTM A615 grade 60; #5 is 1.043 lb/ft |
| Control joint spacing | 2.5 x slab thickness | 10 ft for a 4 in slab; ACI practice for shrinkage cracks |
How to buy materials without a second trip
A calculator is a way to ask a better question, not an answer key.
- Measure the room, not the wall. Length and width give the perimeter; perimeter times ceiling height gives the wall area. Only then subtract the doors and windows, because a paint estimate that starts from the room's footprint is wrong in both directions.
- Use your own coverage number when the label gives one. The 375 sq ft per gallon here is a default; a can of one-coat paint over a sealed wall may promise 400, and a rough stucco wall can take 250. Change the surface before you trust the gallons.
- Add the cut waste before you add the reserve. A straight tile lay loses about 10% to cuts, a herringbone about 20%. That allowance is not spare tile; it is tile that goes in the trash. Buy a separate 5% as attic stock for a repair five years from now, if you want it.
- Compare by the yard, not by the bag. Concrete is priced per bag at a store and per cubic yard on a truck. Forty-five 80 lb bags make a yard, and a short-load fee is charged below the plant's minimum, so the cheaper method changes with the size of the pour.
Why this site exists
Formulas in the open
Each page states the equation it uses, the label or standard behind every default, and how the purchase rounding works, so an assumption you disagree with is one you can see and change.
No lead form, no quote
We do not sell paint, tile, concrete or contractor referrals. There is no commission behind a quantity, so the quantity does not have to be rounded up to flatter a cart.
Tables match the live engine
The worked examples printed in each guide are generated by the same functions the browser runs, so a table and the calculator cannot drift apart.
BuildWise Lab is an independent reference site operated by Minhee Lee. It is not a contractor, a material supplier, or an engineer. Read the methodology or send a correction.