Measured for 2026

Measure twice, buy once — the gallons, the boxes and the bags before you leave the store.

A paint job fails on the second trip to the paint desk; a tile floor fails on the last row with no boxes left; a slab fails at the mixer with half a yard short. These three calculators do the material arithmetic the way a contractor does it on the back of an invoice: wall area with the openings taken out, coverage per gallon by surface, pattern waste by lay, bag yield by weight, a quarter yard of concrete and the short-load fee behind it. Everything runs in your browser, every default names the published figure it comes from, and every table is generated by the same formula the calculator uses.

375 sq ftCoverage of one gallon on smooth, primed drywall
21 sq ftStandard deduction for a door in a paint estimate
15 sq ftStandard deduction for a window
10–20%Tile waste from a straight lay to a herringbone
0.60 cu ftConcrete in one 80 lb bag — 45 bags to the yard
27 cu ftOne cubic yard, the unit a ready-mix truck sells

The three calculators

Every one runs locally. Nothing you type is sent anywhere, stored, or sold.

The 2026 numbers behind the results

Published figures with the source named, so you can check any of them.

Item2026 figureWhere it comes from
Interior paint coverage, smooth primed drywall350–400 sq ft/galManufacturer label range; 375 used as the default
Interior paint coverage, textured or porous250–300 sq ft/galManufacturer label range; 275 used
Bare, unprimed drywall, first coat300 sq ft/galLabel figure for a sealing first coat
Primer coverage300 sq ft/galLabel figure for a drywall or stain-blocking primer
Standard opening deductionsDoor 21 sq ft · Window 15 sq ftTrade estimating convention (3'0" x 7'0" door, 3'0" x 5'0" window)
Finish coats for a colour change2Industry practice; one coat only on an identical colour
Dark-to-light colour change+1 coat and a stain-blocking primerPaint-desk practice for hiding a strong or dark colour
Tile waste, straight lay / brick / diagonal / herringbone10% / 12% / 15% / 20%Contractor cutting allowance by lay pattern
Tiles per square foot144 ÷ (tile width x tile height)Tile area arithmetic in inches
Thinset coverage, 50 lb bag95 / 65 / 42 / 22 sq ft1/4x1/4, 1/4x3/8, 1/2x1/2 and 3/4x3/4 in square-notch trowels
Grout joint depth usedTile thickness + 1/4 inJoint filled over the mortar bed and the tile edge
Grout density used100 lb per cu ftCementitious grout, 0.0579 lb per cubic inch
Concrete bag yield80 lb 0.60 · 60 lb 0.45 · 40 lb 0.30 cu ftManufacturer fill data; 45, 60 and 90 bags per cubic yard
Concrete weight145 lb per cu ftNormal-weight ready-mix, about 4,050 lb per yard
Ready-mix order increment1/4 cu yd, 1 yd minimumStandard batch-plant practice
Wire mesh roll5' x 150' = 750 sq ft6x6 W1.4/W1.4 welded wire, 10% overlap added
#4 rebar0.668 lb/ft, 20 ft sticksASTM A615 grade 60; #5 is 1.043 lb/ft
Control joint spacing2.5 x slab thickness10 ft for a 4 in slab; ACI practice for shrinkage cracks

How to buy materials without a second trip

A calculator is a way to ask a better question, not an answer key.

  1. Measure the room, not the wall. Length and width give the perimeter; perimeter times ceiling height gives the wall area. Only then subtract the doors and windows, because a paint estimate that starts from the room's footprint is wrong in both directions.
  2. Use your own coverage number when the label gives one. The 375 sq ft per gallon here is a default; a can of one-coat paint over a sealed wall may promise 400, and a rough stucco wall can take 250. Change the surface before you trust the gallons.
  3. Add the cut waste before you add the reserve. A straight tile lay loses about 10% to cuts, a herringbone about 20%. That allowance is not spare tile; it is tile that goes in the trash. Buy a separate 5% as attic stock for a repair five years from now, if you want it.
  4. Compare by the yard, not by the bag. Concrete is priced per bag at a store and per cubic yard on a truck. Forty-five 80 lb bags make a yard, and a short-load fee is charged below the plant's minimum, so the cheaper method changes with the size of the pour.

Why this site exists

Formulas in the open

Each page states the equation it uses, the label or standard behind every default, and how the purchase rounding works, so an assumption you disagree with is one you can see and change.

No lead form, no quote

We do not sell paint, tile, concrete or contractor referrals. There is no commission behind a quantity, so the quantity does not have to be rounded up to flatter a cart.

Tables match the live engine

The worked examples printed in each guide are generated by the same functions the browser runs, so a table and the calculator cannot drift apart.

BuildWise Lab is an independent reference site operated by Minhee Lee. It is not a contractor, a material supplier, or an engineer. Read the methodology or send a correction.